Tasks
Add a task, assign people or roles, comment, and break it into subtasks.
Click a card on the board to open it. You can keep the board visible while you edit, or open the task on its own page.
Add a task
On the board, click Add task on a column, or double-click the empty space in that column.
- Write a title (placeholder: What needs to be done?).
- Add a description if you want — checklists and files are fine.
- Set priority, a label, dates, a milestone or cycle, and assignees (people, roles, or both).
- Add subtasks if the work splits naturally (up to 20).
- Click Add task.
If the project has templates, use Use template instead of starting from scratch. See templates.
What you can change
Task details on the side holds status, priority, label, start and due dates, milestone, cycle, and assignees. Changing Status moves the card.
Board cards, list rows, and the task show role badges first, then people's avatars.
The description is a rich editor. If you write tasks through the API, the stored format is explained in task description content.
Assigning roles
You can assign a task to a workspace role, like Design or QA, as well as to people. Pick it from the Roles section at the top of the assignee picker.
A role assignee means shared ownership. Everyone who holds the role owns the task:
- It shows under their Assigned to me, on the project filter and on the dashboard.
- They get the task assigned notification when the role is added. The person who made the change is not notified. If the same task is assigned to you again within 10 minutes, you aren't notified twice.
Which roles you can pick. In a project, you can assign:
- roles with Manage any project, and
- roles added in project access as Editor or Project manager.
Viewer roles can't be assigned.
When a role is removed from tasks. If a role can no longer be assigned in a project, it comes off that project's tasks. That happens when:
- its project access is removed,
- its project access changes to Viewer,
- it loses Manage any project and has no Editor or Project manager access to the project, or
- the role is deleted.
Open boards update right away. Integrations get a task.updated event. These automatic removals write no history entry.
When a person assigns or unassigns a role, the task history shows it, like any other assignee change (for example, "assigned Ana and the Design role").
Comments
The timeline mixes comments and activity. Type in Write a comment…, use @ to mention someone, attach a file if you need to, and click Comment (or ⌘/Ctrl+Enter). Mentions can notify people — they control that in account settings.
Integrations can read a task's comments and history, and post comments, through the API and MCP server.
Subtasks
Subtasks lets you add titles or Link task to something that already exists.
Delete
Delete task removes the card. The project stays.
Planeward Docs